Daily Field Report
Observations/Finding
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:
Observed the placement of fill/grading for Lots #88 and #89 today. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports.
The grading contractor also continued backfill for the retention wall.
In addition, contractor continued placing sewer line. The sewer line placed was located between Manhole A12 and E1 and was about 150 feet in length. Backfilling and compaction were performed following by density testing (see attachments for details).
Please contact us if you have any questions regarding this report or of the density test results.
Picture showing building pads under backfill stage
Deep trench dug for sewer line
Sewer line between Manhole A12 and E1 after backfill