- Home
- Daily Field Report Report ID: 75161
- Edit Download Report
Daily Field Report
Observations/Finding
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:
Observed the placement of fill/grading for Lots #27 through #30 today. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports.
An additional compaction test was performed on Lot #63. Backfilling of the sewer line trench between Manhole A12 & A13 was completed today. General probing found the subgrade soils stable.
Please contact us if you have any questions regarding this report or of the density test results.
Picture depicting 12-50 feet backfill building pads
Sewer line backfilled and compacted