Concrete Test Report
Date :11/26/2024
Project No :2024C189
Client Company :WSP
Arrival Time :11/26/2024 12:30
Onsite Hours :
Name of the Project :Protovision PH II
Project Location :Lithia Springs
Weather :Cloudy
Departure Time :
ASEC Technician Name :Solomon Cherie
Concrete Placement Information
Location(S):
Testing:
1 Set of concrete specimens (5 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Cylinders
Pick Up: 1 Sets of concrete cylinders/ 5 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 1 Sets of concrete cylinders/ 5 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks:
This test was done on Truck#8 at 72 yards and the following results were obtained.
Air=4.8%;
Slump=7"
Temperature=63°F
Unit weight=138.8 psi
Technician Signature / DateSolomon Cherie, November 26, 2024