Daily Field Report

Date :11/13/2024
Project No :2024C168
Client Company :CCG
Arrival Time :11/13/2024 12:00
Onsite Hours :06:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :11/13/2024 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • The placement and compaction of backfill soils for water line in the form Lots# 182 to lot#183 and lot#184 to lot#192, lot#193, lot#238, lot#239, lot#240. continued this day.
  • At the time of arrival, our representative observed that work was in progress with1-foot lifts being placed and compacted using a 6-ton pad feet and trench compaction equipment. Compaction testing was performed using the Standard Test Method for Density of Soil in Place by Drive-Cylinder (ASTM D 2937), along with general probing using a 3/8″ diameter probe rod.
  • Density test results indicate that most of the compacted materials met the project requirement of 95% of the maximum dry density obtained by a Standard Proctor ASTM 698.
  • Note: contractor was working on retaining wall#1 and2 footing, under it was ground water and muddy materials, it was recommended by Ram to undercut about 2 feet of the muddy material and replace it with rib rap rocks and compact it and then add a layer of fabric.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, November 13, 2024