Daily Field Report
Date :11/12/2024
Project No :2024C202
Client Company :CCG
Arrival Time :11/12/2024 07:30
Onsite Hours :9:00
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :Sunny
Departure Time :11/12/2024 16:30
ASEC Technician Name :Solomon Cherie
Observations/Finding
The routine down cutting and back fill I activity was conducted during the day. This was done using the various heavy duty machines such as:
1) Two 745C hauling trucks,
2) One 815F CAT Roller,
3) One 349E CAT excavator,
4) 61 Pxi Kamatsu bulldozer.
The backfill was on Lot# 106, 120 & 119 aligned in about EW direction. The total area was about 250×112 square feet. The three Lots were backfilled to a subgrade.
The dirt was hauled from a nearby downcut location and was in a good agreement with the proctor. The compaction was in a range of 96% and 102%, which was pretty good.
Technician Signature / DateSolomon Cherie, November 12, 2024