- Home
- Daily Field Report Report ID: 72151
- Edit Download Report
Daily Field Report
Date :10/21/2024
Project No :2024C237
Client Company :SR Homes
Arrival Time :10/21/2024 8:30
Onsite Hours :02:00
Name of the Project :Stonewood PH 4, Stone Road
Project Location :Watkinsville
Weather :sunny
Departure Time :10/21/2024 10:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- The lower part of the road was muddied by the rainwater and had organic soil, it was recommended to undercut 2-3 feet of soil and replace it with more suitable soil. the length of the undercut was 140 feet, and width was the same as the road’s width. (Location is shown in the picture)
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateAminullah Azimi, October 21, 2024