- Home
- Daily Field Report Report ID: 71335
- Edit Download Report
Daily Field Report
Date :10/14/2024
Project No :2024C223
Client Company :CWM
Arrival Time : 16:00
Onsite Hours :06:30
Name of the Project :Concourse E Gate & Ramp 6 North Gate
Project Location :HJAIA
Weather :
Departure Time : 22:30
ASEC Technician Name :
Observations/Finding
As requested, our AS Engineering & Consulting LLC representative was on site to observe concrete placement. The following were performed this day:
1) Moisture tests were taken of rock and sand materials.
2) Air content tests, concrete temperature, slump and unit weight were taken for the first truck sampled.
3) One set of eleven (11) beams were cast.
All concrete tests were found to be within job specifications.
Technician Signature / DateSolomon Cherie, October 14, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024