Daily Field Report
Date :09/19/2024
Project No :2024C217
Client Company :Artisan
Arrival Time :09/19/2024 07:45
Onsite Hours :9:15
Name of the Project :Naturewalk at 7 Hills Amenities
Project Location :Dallas
Weather :sunny
Departure Time :09/19/2024 17:0
ASEC Technician Name :Vamsi Polisetty
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- Upon arrival, the contractor was engaged in excavation using a Komatsu PC 360LC to the west of the project site. They were also doing cut with a Komatsu PC210LC. Dirt was being transported with two tandem dump trucks, while dozing and leveling were performed with a Komatsu 39PX and a D85EX. Compaction work was carried out using a CAT 563 E. back filling with boulders are observed under the tennis court. necessary instructions are made to superintendent for proof rolling procedures.
- Compaction testing was performed using a Troxler nuclear density gauge, along with general probing using a 3/8″ diameter probe rod.
- Density test results indicate that compacted materials did not meet the project requirement of 95% of the maximum dry density obtained by a Standard Proctor ASTM 698. compaction suggestions are made to the superintendent.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you
Technician Signature / DateVamsi Polisetty, September 19, 2024