- Home
- Daily Field Report Report ID: 70299
- Edit Download Report
Daily Field Report
Date :09/17/2024
Project No :2024C202
Client Company :CCG
Arrival Time :09/17/2024 12:30
Onsite Hours :04:30
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :cloudy
Departure Time :09/17/2024 17:00
ASEC Technician Name :Vamsi Polisetty
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- At Lot #1024, near the pond, gray soils (alluvium) and organic material (buried wood) was encountered in the excavation. A CAT 336F excavator was used to dig it out, and the material was then moved using a CAT 745 dump truck. The pit being excavated was approximately 57 feet long, 39 feet wide, and 6 feet deep. After the gray material was removed, the pit was backfilled with suitable soil using a Komatsu D39PXi dozer. Finally, a CAT 815F compactor was used to complete compaction.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateVamsi Polisetty, September 17, 2024
Reviewer Name / DateKenneth Mosman, October 23, 2024