Skip to content

Daily Field Report

Date :09/16/2024
Project No :2024C217
Client Company :Artisan
Arrival Time :09/16/2024 08:00
Onsite Hours :9:00
Name of the Project :Naturewalk at 7 Hills Amenities
Project Location :Dallas
Weather :sunny
Departure Time :09/16/2024 17:05
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • Upon arrival, the contractor was engaged in excavation using a Komatsu PC 360LC to the west of the project site. They were also doing cut with a Komatsu PC210LC. Dirt was being transported with two tandem dump trucks, while dozing and leveling were performed with a Komatsu 39PX and a D85EX. Compaction work was carried out using a CAT 563 E. Boulders are chopped to small stones with Deere 350G.
  • Compaction testing was performed using a Troxler nuclear density gauge, along with general probing using a 3/8″ diameter probe rod.
  • Density test results indicate that compacted materials meet the project requirement of 95% of the maximum dry density obtained by a Standard Proctor ASTM 698 at few places and 90% maximum dry density at few places in the same lot. necessary instructions are made to the superintendent for more compaction to reach the expected results.
  • Black soil fill is observed at 940 with a size of 15*12*8 Ft containing organic matter, necessary instructions are made to the superintendent for the removal of black soil.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you

Technician Signature / DateVamsi Polisetty, September 16, 2024