Density Test Report
Date :09/10/2024
Project No :2024C168
Client Company :CCG
Arrival Time :09/10/2024 8:30
Onsite Hours :10:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :09/10/2024 19:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
09/10/2024 | 67 | 21.6 | 98.1 | 26081 | 102.9 | 20.0 | 95.3 | 95 | D2937 | Pass |
Location : | sewer trench, 15 feet to the NE from MHSA16., Elv/Depth :finished grade | |||||||||
Comment : | ||||||||||
09/10/2024 | 68 | 22.0 | 97.9 | 26081 | 102.9 | 20.0 | 95.1 | 95 | D2937 | Pass |
Location : | seer trench, 12 feet to the west from MHSA 16., Elv/Depth :1 foot below finish grade | |||||||||
Comment : | ||||||||||
09/10/2024 | 69 | 23.0 | 99.0 | 26081 | 102.9 | 20.0 | 96.2 | 95 | D2937 | Pass |
Location : | sewer trench, 22 feet to the east from MHSA 17., Elv/Depth :1.5 feet below finish grade | |||||||||
Comment : | ||||||||||
09/10/2024 | 70 | 22.9 | 98.0 | 26081 | 102.9 | 20.0 | 95.2 | 95 | D2937 | Pass |
Location : | sewer trench, 24 feet to the east from MHSA18., Elv/Depth :finished grade | |||||||||
Comment : | ||||||||||
09/10/2024 | 71 | 23.3 | 98.3 | 26081 | 102.9 | 20.0 | 95.5 | 95 | D2937 | Pass |
Location : | sewer trench, 25 feet to the west from MHSA 17., Elv/Depth :finished grade | |||||||||
Comment : | ||||||||||
09/10/2024 | 72 | 22.8 | 101.5 | 26081 | 102.9 | 20.0 | 98.6 | 95 | D2937 | Pass |
Location : | storm water trench, 15 feet to the NE from MHA9., Elv/Depth :1 foot below finish grade | |||||||||
Comment : | ||||||||||
09/10/2024 | 73 | 23.4 | 98.1 | 26081 | 102.9 | 20.0 | 95.3 | 95 | D2937 | Pass |
Location : | storm water trench, 20 feet to the SW from MHA 10., Elv/Depth :2 feet below finish grade | |||||||||
Comment : |
Technician Signature / DateAminullah Azimi, September 10, 2024
Reviewer Name / DateRamchandra Mogulla, September 16, 2024