Density Test Report

Date :09/07/2024
Project No :2024C168
Client Company :CCG
Arrival Time :09/07/2024 8:00
Onsite Hours :07:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :09/07/2024 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/07/2024 57 20.8 102.3 26081 102.9 20.0 99.4 95 D2937 Pass
Location : sewer trench, 45 feet to the SW from MHSA14., Elv/Depth :finished grade
Comment :
09/07/2024 58 23.0 98.0 26081 102.9 20.0 95.2 95 D2937 Pass
Location : sewer trench, 58 feet to the NE from MHSA15., Elv/Depth :finished grade
Comment :
09/07/2024 59 25 87.5 26085 92.0 25.3 95.1 95 D6938 Pass
Location : lot#17, Elv/Depth :2.5 feet below finish grade
Comment : Gauge Serial No. :85759
09/07/2024 60 24.4 89.7 26082 94.1 24.3 95.3 95 D6938 Pass
Location : lot#16, Elv/Depth :3.5 feet below finish grade
Comment : Gauge Serial No. :85759
09/07/2024 61 26.5 91.1 26082 94.1 24.3 96.8 95 D6938 Pass
Location : lot# 15, Elv/Depth :4 feet below finish grade
Comment : Gauge Serial No. :85759
09/07/2024 62 26.2 91.7 26082 94.1 24.3 97.4 95 D6938 Pass
Location : lot#14, Elv/Depth :5.5 feet below finish grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 7, 2024