Skip to content

Daily Field Report

Date :09/06/2024
Project No :2024C217
Client Company :Artisan
Arrival Time :09/06/2024 07:12
Onsite Hours :9:30
Name of the Project :Naturewalk at 7 Hills Amenities
Project Location :Dallas
Weather :cloudy
Departure Time :09/06/2024 16:47
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

The above-mentioned AS Engineering and Consulting (ASEC) representative, visited the Naturewalk at 7 Hills Amenities site to conduct quality control inspection and testing services. Visual observation techniques were employed to ensure compliance with project drawing/specifications, applicable codes, and materials submittals.  The following observations were made on-site:

  • Rock Volume Determination for the blast was performed on this date: Rock volume was determined
    based on the attached drill logs. Drilling was performed on the days leading to today and depths to
    top of rock and termination was recorded.
  • Drilled 176 blasting holes and completed 99 blasting locations.
  • The total quantity of mass rock shot on this day was calculated to be 2,742.2 cubic yards.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding
this report, please feel free to contact us. We will be more than happy to discuss it with you.

  • Blasting is Scheduled @11:00 am
  • Excavation (Komatsu PC 360LC, Komatsu PC370LC), transport (Tandem Off road Dump truck), levelling (Komatsu D85EX), Komatsu 39PX and compaction (CAT CS563 E Sheep toe) of fill @NE of the construction site, continued this day.
  • Boulders were absorbed in the excavation and made a note to the backfilling foreman (Francisco) for back filling instructions on boulders.
  • Larger boulders more than 2′ on all sides are break into small pieces with Deere breaker 350G lc.
  •  Compaction testing was performed four times using a Troxler nuclear density gauge (30942), along with general probing using a 3/8″ diameter probe rod. few observations and necessary changes are suggested to foremen (Francisco).

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you

Technician Signature / DateVamsi Polisetty, September 6, 2024
Reviewer Name / DateKenneth Mosman, September 18, 2024