Density Test Report

Date :07/11/2024
Project No :2024C168
Client Company :CCG
Arrival Time :07/11/2024 8:00
Onsite Hours :9:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :07/11/2024 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/11/2024 1 26 90.5 26082 94.1 24.3 96.2 95 D6938 Pass
Location : Lot #151, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 2 23.2 98.0 26081 102.9 20.0 95.2 95 D6938 Pass
Location : Lot #150, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 3 25.1 91.4 26082 94.1 24.3 97.1 95 D6938 Pass
Location : Lot #243, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 4 24.4 98.3 26081 102.9 20.0 95.5 95 D6938 Pass
Location : Lot #225, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 5 23.1 91.4 26082 94.1 24.3 97.1 95 D6938 Pass
Location : Lot #242, Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 6 25.2 92.9 26082 94.1 24.3 98.7 95 D6938 Pass
Location : Lot #241, Elv/Depth :13 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 7 21.7 99.5 26081 102.9 20.0 96.7 95 D6938 Pass
Location : Lot #240, Elv/Depth :16.5 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 8 25.3 91.4 26082 94.1 24.3 97.1 95 D6938 Pass
Location : Roadway in the front of Lot #241, Elv/Depth :13 feet below finished grade
Comment : Gauge Serial No. :85759
07/11/2024 9 22.7 98.0 26081 102.9 20.0 95.2 95 D6938 Pass
Location : Lot #9, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, July 11, 2024
Reviewer Name / DateKenneth Mosman, July 15, 2024