Skip to content

Density Test Report

Date :07/02/2024
Project No :2024C168
Client Company :CCG
Arrival Time :07/02/2024 8:30
Onsite Hours :08:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :07/02/2024 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/02/2024 1 26.4 93.5 26082 94.1 24.3 99.4 95 D6938 Pass
Location : Lot #171, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
07/02/2024 2 26.6 94.1 26082 94.1 24.3 100.0 95 D6938 Pass
Location : Lot #170, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
07/02/2024 3 26.5 93.4 26082 94.1 24.3 99.3 95 D6938 Pass
Location : Lot #169, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, July 2, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024