Density Test Report

Date :06/20/2024
Project No :2024C112
Client Company :SR Homes
Arrival Time :06/20/2024 8:30
Onsite Hours :06:00
Name of the Project :Sterlington
Project Location :Canton
Weather :sunny
Departure Time :06/20/2024 14:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/20/2024 1 15.3 98.4 P-02 105.9 18.8 92.9 95 D6938 Fail
Location : Lot #19, Elv/Depth :1.5 feet below finished grade
Comment : moisture content was below specified moisture limit. Gauge Serial No. :38069
06/20/2024 2 15.6 97.3 P-02 105.9 18.8 91.9 95 D6938 Fail
Location : Lot #20, Elv/Depth :1.5 feet below finished grade
Comment : moisture content was below specified moisture limit. Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, June 20, 2024
Reviewer Name / DateKenneth Mosman, July 22, 2024