- Home
- Density Test Report Report ID: 67179
- Edit Download Report
Density Test Report
Date :03/19/2024
Project No :2023C111
Client Company :2MATL
Arrival Time :03/19/2024 10:00
Onsite Hours :
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :
Departure Time :03/20/2024
ASEC Technician Name :Zabihullah Lodin
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
03/20/2024 | 1 | 26.8 | 91.5 | 0 | Infinity | 82.1 | D6938 | Pass | ||
Location : | East of N13 and south of runway 27 south, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. : | |||||||||
03/20/2024 | 2 | 22.9 | 97.9 | 0 | Infinity | 87.8 | D6938 | Pass | ||
Location : | East of N13 and south runway 27 south, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. : |
Technician Signature / DateZabihullah Lodin, March 19, 2024
Reviewer Name / DateKenneth Mosman, July 10, 2024