Density Test Report

Date :06/11/2024
Project No :2024C112
Client Company :SR Homes
Arrival Time :06/11/2024 9:00
Onsite Hours :08:00
Name of the Project :Sterlington
Project Location :Canton
Weather :sunny
Departure Time :06/11/2024 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/11/2024 1 15.6 99.3 P-02 105.9 18.8 93.8 95 D6938 Fail
Location : Lot #18, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
06/11/2024 2 15.7 98.7 P-02 105.9 18.8 93.2 95 D6938 Fail
Location : Lot #19, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, June 11, 2024
Reviewer Name / DateKenneth Mosman, July 19, 2024