Skip to content

Density Test Report

Date :06/05/2024
Project No :2024C112
Client Company :SR Homes
Arrival Time :06/05/2024 9:00
Onsite Hours :08:30
Name of the Project :Sterlington
Project Location :Canton
Weather :sunny
Departure Time :06/05/2024 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/05/2024 1 16.7 101.1 P-02 105.9 18.8 95.5 95 D6938 Pass
Location : Lot #9, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :38069
06/05/2024 2 15.3 97.3 P-02 105.9 18.8 91.9 95 D6938 Fail
Location : Lot #8, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
06/05/2024 2 15.1 97.0 P-02 105.9 18.8 91.6 95 D6938 Fail
Location : Lot #3, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :38069
06/05/2024 4 15.2 97.7 P-02 105.9 18.8 92.3 95 D6938 Fail
Location : Lot #9, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :38069
06/05/2024 5 18.5 100.8 P-02 105.9 18.8 95.2 95 D6938 Pass
Location : Lot #8, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :38069
06/05/2024 6 15.4 95.5 P-02 105.9 18.8 90.2 95 D6938 Fail
Location : Lot #7, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
06/05/2024 7 15.8 95.5 P-02 105.9 18.8 90.2 95 D6938 Fail
Location : Lot #8, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, June 5, 2024
Reviewer Name / DateKenneth Mosman, July 18, 2024