- Home
- Density Test Report Report ID: 66552
- Edit Download Report
Density Test Report
Date :05/16/2024
Project No :2021C002
Client Company :CW Matthews
Arrival Time :05/16/2024 13:00
Onsite Hours :04:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :cloudy
Departure Time :05/16/2024 17:
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
05/16/2024 | 1 | 5 | 141.1 | 2 | 141.4 | 5.7 | 95.0 | 95 | D6938 | Fail |
Location : | In-line valve, STA 7016+20, Elv/Depth :finished grade | |||||||||
Comment : | Gauge Serial No. :38-69 | |||||||||
05/16/2024 | 2 | 3.9 | 139.7 | 2 | 141.4 | 5.7 | 95.1 | 95 | D6938 | Pass |
Location : | STA 7005+40, Elv/Depth :finished grade | |||||||||
Comment : | Gauge Serial No. :38069 |
Technician Signature / DateAminullah Azimi, May 16, 2024
Reviewer Name / DateKenneth Mosman, July 12, 2024