Skip to content

Density Test Report

Date :05/16/2024
Project No :2021C002
Client Company :CW Matthews
Arrival Time :05/16/2024 13:00
Onsite Hours :04:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :cloudy
Departure Time :05/16/2024 17:
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/16/2024 1 5 141.1 2 141.4 5.7 95.0 95 D6938 Fail
Location : In-line valve, STA 7016+20, Elv/Depth :finished grade
Comment : Gauge Serial No. :38-69
05/16/2024 2 3.9 139.7 2 141.4 5.7 95.1 95 D6938 Pass
Location : STA 7005+40, Elv/Depth :finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, May 16, 2024
Reviewer Name / DateKenneth Mosman, July 12, 2024