Skip to content

Daily Field Report

Date :05/16/2024
Project No :2022C106
Client Company :CWM
Arrival Time :05/16/2024 6:00
Onsite Hours :07:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :sunny
Departure Time :05/16/2024 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

Observed the placement and testing of concrete for NLVR located on taxiway 2022 phase 7B.

Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time.

Technician Signature / DateAminullah Azimi, May 16, 2024
Reviewer Name / DateKenneth Mosman, July 12, 2024