Skip to content

Density Test Report

Date :04/02/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :04/02/2024 08:30
Onsite Hours :07:15
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Cloudy
Departure Time :04/02/2024 15:45
ASEC Technician Name :Fawad Shagiwal

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/02/2024 01 25.2 88.7 1 83.2 25.3 106.6 95 D6938 Pass
Location : Lot #26, Elv/Depth :12 feet from the bottom of the MSE wall
Comment : Gauge Serial No. :3430
04/02/2024 02 24.1 87.2 1 83.2 25.3 104.8 95 D6938 Pass
Location : Lot #28, Elv/Depth :12 feet from the bottom of the MSE wall
Comment : Gauge Serial No. :3430
Technician Signature / DateFawad Shagiwal, April 2, 2024
Reviewer Name / DateKenneth Mosman, April 25, 2024