Skip to content

Density Test Report

Date :02/23/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/23/2024 15:30
Onsite Hours :01:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :cloudy
Departure Time :02/23/2024 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/23/2024 1 29.3 85.2 1 83.2 25.3 102.4 90 D6938 Pass
Location : Lot #48, Elv/Depth :3 feet below finished grade
Comment : Moisture content exceeded 3 percent over optimum moisture content Gauge Serial No. :85759
02/23/2024 2 28.8 87.0 1 83.2 25.3 104.6 95 D6938 Pass
Location : Lot #49, Elv/Depth :2.5 feet below finished grade
Comment : Moisture content exceeded 3 percent over optimum moisture content Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 23, 2024
Reviewer Name / DateKenneth Mosman, March 16, 2024