- Home
- Density Test Report Report ID: 64030
- Edit Download Report
Density Test Report
Date :02/06/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/06/2024 15:00
Onsite Hours :02:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :02/06/2024 17:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
02/06/2024 | 1 | 28 | 89.8 | 4 | 98.6 | 20.2 | 91.1 | 95 | D6938 | Fail |
Location : | Lot #20, Elv/Depth :2 feet below finished grade | |||||||||
Comment : | Moisture content 3 percent more than optimum moisture content. | Gauge Serial No. :85759 | ||||||||
02/06/2024 | 2 | 19.8 | 94.4 | 3 | 99.4 | 21.3 | 95.0 | 95 | D6938 | Fail |
Location : | Basement of Lot #20, Elv/Depth :1 foot below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
02/06/2024 | 3 | 27.1 | 120.0 | 3 | 99.4 | 21.3 | 95.0 | 95 | D6938 | Fail |
Location : | Basement for Lot #19, Elv/Depth :1 foot below finished grade | |||||||||
Comment : | Moisture content 3 percent more than optimum moisture content. | Gauge Serial No. :85759 | ||||||||
02/06/2024 | 4 | 28.7 | 91.1 | 2 | 95.0 | 23.5 | 95.9 | 95 | D6938 | Pass |
Location : | Lot #20, Elv/Depth :1 foot below finished grade | |||||||||
Comment : | Moisture content 3 percent more than optimum moisture content. | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, February 6, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024