Density Test Report

Date :01/18/2024
Project No :2023C141
Client Company :Toll Bros
Arrival Time :01/18/2024 13:00
Onsite Hours :04:00
Name of the Project :N. Gate - Old Atlanta Road
Project Location :Cumming
Weather :cloudy
Departure Time :01/18/2024 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/18/2024 1 20.3 102.8 24468 111.3 17.5 92.4 90 D6938 Pass
Location : Water storm line, 67 feet SE of MH 2H, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
01/18/2024 2 16.8 101.5 24468 111.3 17.5 91.2 90 D6938 Pass
Location : Water storm line , 29 feet NW of MH 2H.2, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :85759
01/18/2024 3 22 101.6 24468 111.3 17.5 91.3 90 D6938 Pass
Location : location shown in picture , Elv/Depth :16 feet below finished grade
Comment : Gauge Serial No. :85759
01/18/2024 4 20.2 107.6 24468 111.3 17.5 96.7 90 D6938 Pass
Location : location shown in picture, Elv/Depth :19 feet below finished grade
Comment : Gauge Serial No. :85759
01/18/2024 5 21.3 102.0 24468 111.3 17.5 91.6 90 D6938 Pass
Location : location shown in picture , Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 18, 2024
Reviewer Name / DateKenneth Mosman, March 10, 2024