Density Test Report

Date :01/03/2024
Project No :2023C141
Client Company :Toll Bros
Arrival Time :01/03/2024 9:00
Onsite Hours :04:30
Name of the Project :N. Gate - Old Atlanta Road
Project Location :Cumming
Weather :sunny
Departure Time :01/03/2024 13:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/03/2024 1 20.6 102.5 24468 111.3 17.5 92.1 90 D6938 Pass
Location : Sewer line, 35 feet SW of MH B4,, Elv/Depth :6.5 feet below finished grade
Comment : Gauge Serial No. :85759
01/03/2024 2 16.2 98.3 24469 103.9 18.7 94.6 90 D6938 Pass
Location : Sewer line, 40 feet NE of MH B4,, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
01/03/2024 3 22.4 99.0 24469 103.9 18.7 95.3 90 D6938 Pass
Location : 93 feet SW of MH B5,, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
01/03/2024 4 19.9 95.2 24469 103.9 18.7 91.6 90 D6938 Pass
Location : roadway (location shows in pictures), Elv/Depth :16 feet below finished grade
Comment : Gauge Serial No. :85759
01/03/2024 5 16.7 103.0 24468 111.3 17.5 92.5 90 D6938 Pass
Location : roadway (location shows in pictures), Elv/Depth :19 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 3, 2024
Reviewer Name / DateKenneth Mosman, March 10, 2024