- Daily Field Report Report ID: 63429
- Edit Download Report
Daily Field Report
Date :12/20/2023
Project No :2022C205
Client Company :Pulte
Arrival Time :12/20/2023 03:45
Onsite Hours :02:30
Name of the Project :Enclave at Parkway Village
Project Location :Union City
Weather :sunny/cloudy
Departure Time :12/20/2023 06:15
ASEC Technician Name :Isaac Davis
Observations/Finding
Our AS Engineering & Consulting, Inc representative arrived on site to perform soil bearing pressure evaluations for the following lots:
- Lot #64F – Westend
- H1:
- Ft1: Identified as red sandy silt mica with a blow count of 8.
- Offsets:
- Offset Ft2: Auger Refusal (AR) encountered, transitioning into rock at depths of 1 foot 7 inches, 1 foot 2 inches, 1 foot 6 inches, and 1 foot 4 inches.
- H1:
- Lot #64B – Eastend
- H2:
- Ft1: Comprised red/white sandy silt mica with a blow count of 10.
- Offsets:
- Offset Ft2: Auger Refusal (AR) encountered, reaching rock layers at depths of 1 foot 2 inches, 11 inches, and 10 inches.
- H2:
Observations:
- Wire mesh and rebar were observed appropriately placed on chairs and met project specifications for size, spacing and quantity.
Conclusion: The assessment of Enclave at Parkway, particularly Lots #64F and Lot #64B, revealed varying soil compositions and depths across different footing points. In Lot #64F, the initial footing exhibited red sandy silt w/mica, while multiple offsets encountered rock layers at varying depths. Similarly, in Lot #64B, the main footing consisted of red/white sandy silt w/mica, with several offset points transitioning into rock layers at different depths.
Technician Signature / DateIsaac Davis, December 20, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024