- Home
- Density Test Report Report ID: 63401
- This project is inactive from admin.Download Report
Density Test Report
Date :12/18/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/18/2023 12:00
Onsite Hours :03:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/18/2023 15:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
12/18/2023 | 1 | 18.9 | 105.4 | 24208 | 110.4 | 16.3 | 95.5 | 90 | D6938 | Pass |
Location : | water storm, 16 feet south of MH 9G., Elv/Depth :2.5 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
12/18/2023 | 2 | 18.8 | 106.1 | 24209 | 111.6 | 16.5 | 95.1 | 90 | D6938 | Pass |
Location : | water storm, 30 feet north of MH14A, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, December 18, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024