Skip to content

Density Test Report

Date :12/15/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/15/2023 13:30
Onsite Hours :02:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/15/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/15/2023 1 16.9 106.7 24209 111.6 16.5 95.6 95 D6938 Pass
Location : 67 feet to east of MH 9J., Elv/Depth :finished grade
Comment : Gauge Serial No. :
12/15/2023 2 19.8 105.3 24208 110.4 16.3 95.4 95 D6938 Pass
Location : 110 feet west of MH 9I., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
12/15/2023 3 32.1 87.7 24207 87.8 31.0 99.9 95 D6938 Pass
Location : 23 feet south of MH 9J., Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 15, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024