Daily Field Report
Date :11/13/2023
Project No :2022C218
Client Company :CW Matthews
Arrival Time :11/13/2023 7:30
Onsite Hours :10:00
Name of the Project :Ramp 20 Pavement Replacement - IFB-1230102
Project Location :HJAIA
Weather :cloudy
Departure Time :11/13/2023 17:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- Observed the placement and sampling of 120 cubic yards 5000 psi concrete for Ramp 20, phase 4, slat drains,
- Observed coring for ramp 20, phase 4.
In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Technician Signature / DateAminullah Azimi, November 13, 2023
Reviewer Name / DateKenneth Mosman, December 12, 2023