Density Test Report

Date :10/03/2023
Project No :2023C144
Client Company :CCG
Arrival Time :10/03/2023 8:00
Onsite Hours :07:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :10/03/2023 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/03/2023 1 24.3 91.6 P-1 96.5 22.3 94.9 90 D6938 Pass
Location : Lot #38, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
10/03/2023 2 23.7 91.5 P-1 96.5 22.3 94.8 90 D6938 Pass
Location : Lot #37, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
10/03/2023 3 23.7 93.9 P-1 96.5 22.3 97.3 90 D6938 Pass
Location : Lot #36, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
10/03/2023 4 24.2 88.7 P-1 96.5 22.3 91.9 90 D6938 Pass
Location : Lot #35, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
10/03/2023 5 21.5 87.7 P-1 96.5 22.3 90.9 90 D6938 Pass
Location : at sewer trench, 40 feet to East of MH C7. , Elv/Depth :16 feet below finished grade
Comment : Gauge Serial No. :85759
10/03/2023 6 21.6 87.0 P-1 96.5 22.3 90.2 90 D6938 Pass
Location : at sewer trench, 16 feet to East of MH C7., Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, October 3, 2023
Reviewer Name / DateKenneth Mosman, October 08, 2023