Skip to content

Density Test Report

Date :09/28/2023
Project No :2023C144
Client Company :CCG
Arrival Time :09/28/2023 8:00
Onsite Hours :08:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :09/28/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/28/2023 1 28.9 90.6 P-1 96.5 22.3 93.9 90 D6938 Pass
Location : Lot #107 , Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
09/28/2023 2 28.2 92.2 P-1 96.5 22.3 95.5 90 D6938 Pass
Location : Lot #108, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
09/28/2023 3 26.5 92.6 P-1 96.5 22.3 96.0 90 D6938 Pass
Location : Lot #106, Elv/Depth :basement finished grade
Comment : Gauge Serial No. :85759
09/28/2023 4 28 90.9 P-1 96.5 22.3 94.2 90 D6938 Pass
Location : Lot #107, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
09/28/2023 5 28.3 92.0 P-1 96.5 22.3 95.3 90 D6938 Pass
Location : Lot #108, Elv/Depth :8 inches below finished grade
Comment : Gauge Serial No. :85759
09/28/2023 6 27.3 92.5 P-1 96.5 22.3 95.9 90 D6938 Pass
Location : Lot #107, Elv/Depth :8 inches below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 28, 2023
Reviewer Name / DateKenneth Mosman, October 08, 2023