Skip to content

Density Test Report

Date :09/21/2023
Project No :2023C144
Client Company :CCG
Arrival Time :09/21/2023 8:00
Onsite Hours :08:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :09/21/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/21/2023 1 27.9 90.6 P-1 96.5 22.3 93.9 90 D6938 Pass
Location : Lot #45, Elv/Depth :at finished grade
Comment : Moisture content was very high (wet) Gauge Serial No. :85759
09/21/2023 2 28.1 91.4 P-1 96.5 22.3 94.7 90 D6938 Pass
Location : Lot #46, Elv/Depth :finished grade
Comment : Moisture content was very high (wet) Gauge Serial No. :85759
09/21/2023 3 26.4 93.7 P-1 96.5 22.3 97.1 90 D6938 Pass
Location : Lot #47, Elv/Depth :at finished grade
Comment : Moisture content was very high (wet) Gauge Serial No. :85759
09/21/2023 4 25.6 90.1 P-1 96.5 22.3 93.4 90 D6938 Pass
Location : Roadway west of Lot #106, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
09/21/2023 5 25.2 90.2 P-1 96.5 22.3 93.5 90 D6938 Pass
Location : Roadway west of Lot #107, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
09/21/2023 6 25 92.5 P-1 96.5 22.3 95.9 90 D6938 Pass
Location : Lot #48, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 21, 2023
Reviewer Name / DateKenneth Mosman, October 01, 2023