Density Test Report

Date :09/20/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/20/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/20/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/20/2023 2 17.5 106.8 43409 107.5 17.8 Check
Location : Section 1 basement area , Elv/Depth :279
Comment :
09/20/2023 2 18 104.9 43409 107.5 17.8 97.6 95 D6938 Pass
Location : section 1 basement area B7, Elv/Depth :279
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, September 20, 2023
Reviewer Name / DateRamchandra Mogulla, October 12, 2023