Skip to content

Density Test Report

Date :09/01/2023
Project No :2023C144
Client Company :CCG
Arrival Time :09/01/2023 08:00
Onsite Hours :04:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :cloudy
Departure Time :09/01/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/01/2023 1 22.8 101.1 P-1 96.5 22.3 104.8 95 D6938 Pass
Location : STA 2+60.00, Elv/Depth :6.5 feet below finished grade
Comment : Gauge Serial No. :85759
09/01/2023 2 21.5 119.6 P-1 96.5 22.3 102.0 95 D6938 Pass
Location : STA 1+60.00, Elv/Depth :9.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 1, 2023
Reviewer Name / DateKenneth Mosman, September 17, 2023