Density Test Report

Date :08/21/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :08/21/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :08/21/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/21/2023 4 17.3 106.2 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :267
Comment :
08/21/2023 1 15.7 108.6 43409 107.5 17.8 101.0 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :273.5
Comment : Gauge Serial No. :30942
08/21/2023 2 15.1 108.1 43409 107.5 17.8 100.6 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :267
Comment : Gauge Serial No. :30942
08/21/2023 3 16.5 107.9 43409 107.5 17.8 100.4 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :267
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, August 21, 2023
Reviewer Name / DateRamchandra Mogulla, August 27, 2023