Daily Field Report
Date :08/11/2023
Project No :2022C218
Client Company :CW Matthews
Arrival Time :08/11/2023 16:00
Onsite Hours :04:00
Name of the Project :Ramp 20 Pavement Replacement - IFB-1230102
Project Location :HJAIA
Weather :sunny
Departure Time :08/11/2023 20:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- A pre-pour observation was performed in the Ramp 20, phase 3, Lane 2 and Lane 4, portions of the project this day. The contractor completed rebar and dowel basket placement for these lanes.
- The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were required.
- Contractor cleaned loose rock and debris and puddles of water from the base.
- Baskets were found to be level and straight and secured as per job specifications.
- Our representative along with Thomas of ATLQA and the ATLNext representative Braylyn and CWM rep Brandon signed the pre-pour card.
Technician Signature / DateAminullah Azimi, August 11, 2023
Reviewer Name / DateKenneth Mosman, September 15, 2023