- Home
- Daily Field Report Report ID: 60400
- Edit Download Report
Daily Field Report
Date :07/17/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :07/17/2023 7:00
Onsite Hours :01:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :sunny
Departure Time :07/17/2023 8:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
Our representative was on site to observed the placement of concrete for Vault 3. Following a period of standby time, the contractor elected to cancel the concrete placement for the day.
Technician Signature / DateAminullah Azimi, July 17, 2023
Reviewer Name / DateKenneth Mosman, July 30, 2023