Skip to content

Density Test Report

Date :07/06/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :07/06/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :07/06/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/06/2023 2 16.2 108.5 46268 105.1 18.6 103.2 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :255
Comment : Gauge Serial No. :30942
07/06/2023 3 17.3 108.4 46268 105.1 18.6 103.1 90 D6938 Pass
Location : section 1 basement area G7, Elv/Depth :255
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, July 6, 2023
Reviewer Name / DateRamchandra Mogulla, July 13, 2023