- Density Test Report Report ID: 59467
- Edit Download Report
Density Test Report
Date :05/25/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :05/25/2023 9:00
Onsite Hours :03:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :05/25/2023 12:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
05/25/2023 | 1 | 28.5 | 85.0 | P-01 | 100.4 | 18.6 | 84.7 | 90 | D6938 | Fail |
Location : | lot 417, Elv/Depth :16 feet below finish grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
05/25/2023 | 2 | 30.1 | 81.4 | P-01 | 100.4 | 18.6 | 81.1 | 90 | D6938 | Fail |
Location : | lot 416, Elv/Depth :9 feet below finish grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
05/25/2023 | 3 | 24.3 | 114.2 | P-01 | 100.4 | 18.6 | 113.7 | 90 | D6938 | Pass |
Location : | lot 415, Elv/Depth :3.5 feet below basement pad | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, May 25, 2023
Reviewer Name / DateRamchandra Mogulla, September 14, 2023