Skip to content

Daily Field Report

Date :05/20/2023
Project No :2022C106
Client Company :CWM
Arrival Time :05/20/2023 12:00
Onsite Hours :04:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :cloudy
Departure Time :05/20/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

The placement and compaction of GAB for taxiway 6B shoulder attached to lane 4 and lane 5 continued this day.

At the time of arrival, our representative observed that work was in progress near finished grade and compacted using a trench compactor.

Density test results indicate that the compacted materials met the project requirement of 95%.

Our representative also observed straightedge on taxiway 6B. A 3/8-inch low spot was observed in lane 1 panel 2, traveling north. Craig with AtLnext was notified.

Technician Signature / DateAminullah Azimi, May 20, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023