Date :05/22/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :05/22/2023 22:00
Onsite Hours :08:30
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :overcast
Departure Time :05/23/2023 06:30
ASEC Technician Name :Isaac Davis

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/23/2023 1 8.4 111.6 M10 119.0 11.4 93.8 90 D6938 Pass
Location : AVS NS north of economy parking exist , Elv/Depth :Approximately -4 feet below grade
Comment : Gauge Serial No. :
05/23/2023 2 11.4 112.8 M10 119.0 11.4 94.8 90 D6938 Pass
Location : AVS NS north of economy parking exist , Elv/Depth :Approximately -3.5 feet below grade
Comment : Gauge Serial No. :
05/23/2023 3 10.3 115.1 M10 119.0 11.4 96.7 90 D6938 Pass
Location : AVS NS north of economy parking exist , Elv/Depth :Approximately -2 feet below grade
Comment : Gauge Serial No. :
05/23/2023 4 8.4 112.5 M10 119.0 11.4 94.5 90.7 D6938 Pass
Location : AVS NS north of economy parking exist , Elv/Depth :Approximately -2 feet below grade
Comment : Gauge Serial No. :
05/23/2023 5 7.7 114.1 M10 119.0 11.4 95.9 95 D6938 Pass
Location : AVS NS north of economy parking exist , Elv/Depth :Approximately -1.5 feet below grade
Comment : Gauge Serial No. :
05/23/2023 6 11 115.2 M10 119.0 11.4 96.8 95 D6938 Pass
Location : AVS NS north of economy parking exist , Elv/Depth :At finished grade
Comment : Gauge Serial No. :
Technician Signature / DateIsaac Davis, May 22, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023