- Home
- Density Test Report Report ID: 59267
- This project is inactive from admin.Download Report
Density Test Report
Date :05/10/2023
Project No :2022C113
Client Company :CWM
Arrival Time :05/10/2023 8:00
Onsite Hours :04:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :cloudy
Departure Time :05/10/2023 12:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
05/10/2023 | 1 | 3 | 135.0 | GAB 23411 | 140.2 | 5.7 | 96.3 | 90 | D6938 | Pass |
Location : | 172 feet to west of MH#1, Elv/Depth :@finish grade | |||||||||
Comment : | test result is on standby until receive proctor from lab | Gauge Serial No. :85759 | ||||||||
05/10/2023 | 2 | 3.7 | 136.1 | GAB 23411 | 140.2 | 5.7 | 97.1 | 90 | D6938 | Pass |
Location : | 117 feet to west of MH#1, Elv/Depth :at finish grade | |||||||||
Comment : | test result is on standby until receive proctor from lab | Gauge Serial No. :85759 | ||||||||
05/10/2023 | 3 | 3.6 | 134.4 | GAB 23411 | 140.2 | 5.7 | 95.9 | 90 | D6938 | Pass |
Location : | 73 feet to west of MH#1, Elv/Depth :at finish grde | |||||||||
Comment : | test result is on standby until receive proctor from lab | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, May 10, 2023
Reviewer Name / DateRamchandra Mogulla, July 10, 2023