Density Test Report

Date :05/09/2023
Project No :2022C113
Client Company :CWM
Arrival Time :05/09/2023 12:00
Onsite Hours :04:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :sunny
Departure Time :05/09/2023 16:
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/09/2023 1 4.6 135.0 Recycled GAB 134.9 8.7 100.1 90 D6938 Pass
Location : 102 feet to west of MH1, Elv/Depth :8 inches below finish grade
Comment : result is standby until receive proctor from lab Gauge Serial No. :85759
05/09/2023 2 6 134.6 GAB 23411 140.2 5.7 96.0 90 D6938 Pass
Location : 137 feet to west of MH#1, Elv/Depth :8 inches below finish grade
Comment : result is on standby until receive proctor from lab Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, May 9, 2023
Reviewer Name / DateRamchandra Mogulla, July 10, 2023