Daily Field Report
Date :05/12/2023
Project No :2022C113
Client Company :CWM
Arrival Time :05/12/2023 8:00
Onsite Hours :08:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :rainy
Departure Time :05/12/2023 16:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- Pre-pour observation performed in the Ramp 2, Lane 1 and lane 3 portions of the project on this day. Contractor completed rebar and dowel basket placement for these lanes.
- The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were needed.
- The contractor cleaned out loose rock and debris.
- Baskets were found to be level, straight and secured.
- Dowel bars were found to have epoxy. Embedment length was found to be 15 inches into concrete.
- The writer along with Josi of ATLQA and ATLNext representative Hazim and CWM rep Brandon signed the pre-pour card.
- At the time of arrival, work was in progress for manhole installation this day.
Technician Signature / DateAminullah Azimi, May 12, 2023