Date :04/13/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :04/13/2023 06:00
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Raining
Departure Time :04/13/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Vidal Dias, visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R5, E720659 S1-R5.)

During the visit, the following observations were made:

  1. One hundred and twenty-six (126) cubic yards of fill materials were received for the purpose of lift four (4) in section 2 area G7 (drawing E720659) of the basement. The materials were placed in compliance with ITP-001.
  2. A moisture test was performed, and the soils exceeded the required moisture limits. 
  3. A proof-roll was performed in the basement area H7 in section-1 at the ramp area.

Photo documentation is attached below:

 

Technician Signature / DateVidal Dias, April 13, 2023
Reviewer Name / DateRamchandra Mogulla, April 24, 2023