- Home
- Density Test Report Report ID: 58581
- Edit Download Report
Density Test Report
Date :04/13/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :04/13/2023 8:30
Onsite Hours :06:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Cloudy
Departure Time :04/13/2023 14:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
04/13/2023 | 1 | 28.1 | 85.2 | 5 | 93.8 | 20.9 | 90.8 | 90 | D6938 | Pass |
Location : | 17 feet to NE of MH AA70, Elv/Depth :5 feet from finish grade | |||||||||
Comment : | Moisture content exceeded from specified limit range. | Gauge Serial No. :85759 | ||||||||
04/13/2023 | 2 | 30.2 | 84.6 | 5 | 93.8 | 20.9 | 90.2 | 90 | D6938 | Pass |
Location : | 88 feet to SW of MH AA80., Elv/Depth :6 feet below finish grade | |||||||||
Comment : | Moisture content exceeded from specified limit range. | Gauge Serial No. :85759 | ||||||||
04/13/2023 | 3 | 30.5 | 85.5 | 5 | 93.8 | 20.9 | 91.2 | 90 | D6938 | Pass |
Location : | 44 feet to SW of MH AA80., Elv/Depth :5 feet below finish grade | |||||||||
Comment : | Moisture content exceeded from specified limit range. | Gauge Serial No. :85759 | ||||||||
04/13/2023 | 4 | 30.1 | 84.7 | 5 | 93.8 | 20.9 | 90.3 | 90 | D6938 | Pass |
Location : | 33 feet to SW of MH AA80., Elv/Depth :5 feet below finish grade | |||||||||
Comment : | Moisture content exceeded from specified limit range. | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, April 13, 2023
Reviewer Name / DateRamchandra Mogulla, April 21, 2023