Skip to content

Density Test Report

Date :03/16/2023
Project No :2022C136
Client Company :Century
Arrival Time :03/16/2023 17:00
Onsite Hours :01:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :Sunny
Departure Time :03/16/2023 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/16/2023 1 22.2 100.9 P-1 99.0 21.4 101.9 90 D6938 Pass
Location : Lot #1, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
03/16/2023 2 22.2 103.6 P-1 99.0 21.4 104.6 90 D6938 Pass
Location : Lot #2, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
03/16/2023 3 21.9 100.5 P-1 99.0 21.4 101.5 90 D6938 Pass
Location : Lot #3, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
03/16/2023 4 25.4 96.8 P-1 99.0 21.4 97.8 90 D6938 Pass
Location : Lot #4, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
03/16/2023 5 22.0 102.0 P-1 99.0 21.4 103.0 90 D6938 Pass
Location : Lot #5, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 16, 2023
Reviewer Name / DateKenneth Mosman, April 02, 2023