Density Test Report

Date :01/28/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :01/28/2023 9:00
Onsite Hours :07:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :cloudy
Departure Time :01/28/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/28/2023 1 15.6 93.1 P-01 100.4 18.6 92.7 90 D6938 Pass
Location : Lot #422, Elv/Depth :- 11' from finished grade
Comment : soil had rocks. Gauge Serial No. :85759
01/28/2023 2 17.5 95.5 P-01 100.4 18.6 95.1 90 D6938 Pass
Location : at roadway, Elv/Depth :- 13' from finished grade
Comment : Gauge Serial No. :85759
01/28/2023 3 18.1 97.4 P-01 100.4 18.6 97.0 90 D6938 Pass
Location : Lot #424, Elv/Depth :- 12' from finished grade
Comment : Gauge Serial No. :85759
01/28/2023 4 16.6 94.3 P-01 100.4 18.6 93.9 90 D6938 Pass
Location : Lot #423, Elv/Depth :- 12.5' from finished grade
Comment : Gauge Serial No. :85759
01/28/2023 5 17.1 107.3 P-01 100.4 18.6 91.2 90 D6938 Pass
Location : Lot #421, Elv/Depth :- 2' from finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 28, 2023
Reviewer Name / DateKenneth Mosman, February 05, 2023