Density Test Report

Date :01/11/2023
Project No :2022C136
Client Company :Century
Arrival Time :01/11/2023 12:30
Onsite Hours :05:30
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :Sunny
Departure Time :01/11/2023 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/11/2023 1 22.4 99.3 P-1 99.0 21.4 100.3 90 D6938 Pass
Location : Lot #57, Elv/Depth :-1 from finished grade
Comment : Gauge Serial No. :85759
01/11/2023 2 25.2 95.4 P-1 99.0 21.4 96.4 90 D6938 Pass
Location : Lot #56, Elv/Depth :- 1 from finished grade
Comment : Gauge Serial No. :85759
01/11/2023 3 21.2 97.5 P-1 99.0 21.4 98.5 90 D6938 Pass
Location : Lot #60, Elv/Depth :- 1 from finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 11, 2023
Reviewer Name / DateKenneth Mosman, January 22, 2023